Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with conducting horizontal underground boring. This includes prestart and planning, contact with asset owners, traffic and pedestrian control, and emergency procedure in case of contact.
(includes potential hazards and control measures)