Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Drilling & Piling SWMS 10593-2

Drilling & Piling SWMS 10593-2

Product SKU: 10593
Drilling & Piling SWMS 10593-2 Video

Other Details

PDF Download:
drilling_piling_swms_10__15763_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Drilling and Piling Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with conducting drilling and piling operations with the use of an excavator based midi drill. This includes prestart and planning, auger drilling & piling and winch operation and, on-site maintenance. 

Job Steps Covered in Drilling and Piling SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Delivery and removal of the plant
  4. Assess onsite conditions for operations
  5. Work area platform
  6. Pre start check
  7. Site movement
  8. Operation
  9. Operation - Attachments
  10. Operation - Lifting Equipment
  11. Winch Operation
  12. Manually moving / lifting equipment
  13. Maintenance on site
  14. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...