Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Drilling (Vehicle Mounted) SWMS 10030-4

Drilling (Vehicle Mounted) SWMS 10030-4

Product SKU: 10030
Drilling (Vehicle Mounted) SWMS 10030-4 Video

Other Details

PDF Download:
drilling_vehicle_mounted_swms_10030-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Drilling (Vehicle Mounted) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general hazards associated with the operation of vehicle mounted auger drill rig. This includes use of the vehicle, including prestart and operational use, traffic and pedestrian control, and use of auger equipment.

Job Steps Covered in Drilling (Vehicle Mounted) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, between & from site
  4. Assess onsite conditions for operations
  5. Site set-up
  6. Drilling Operation
  7. Maintenance on site
  8. On completion
  9. Vehicle Roll-Over - Emergency Response
  10. Record Keeping/Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...