Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Drone Operation (Remotely Piloted Aircraft) SWMS 10610-1

Drone Operation (Remotely Piloted Aircraft) SWMS 10610-1

Product SKU: 10610
Drone Operation (Remotely Piloted Aircraft) SWMS 10610-1 Video

Other Details

PDF Download:
Drone Operation (remotely piloted aircraft) SWMS 10610-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Drone Operation (Remotely Piloted Aircraft) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the general safe use of a remotely piloted aircraft/Drone (RPA). This SWMS covers planning, training and capabilities, assessing onsite conditions, preflight and drone operation.

This SWMS does not detail the specific regulations as prescribed by the Civil Aviation Safety Authority (CASA) for operational use. 

Job Steps Covered in Drone Operation (Remotely Piloted Aircraft) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & travel between sites 
  4. Assess onsite conditions & site set-up
  5. Pre-flight
  6. Operating the drone
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...