Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Drop Saw (Metal - Wood) SWMS 10171-5

Drop Saw (Metal - Wood) SWMS 10171-5

Product SKU: 10171
Drop Saw (Metal - Wood) SWMS 10171-5 Video

Other Details

PDF Download:
drop_saw_metal_wood_swms_10171-5_SAMPLE


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Drop Saw (Metal - Wood) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of a portable drop saw for cutting metal and timber.  

Job Steps Covered in Drop Saw (Metal - Wood) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Work area set up
  5. Operating the drop saw
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...