Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Duct Work Installation SWMS 10571-2

Duct Work Installation SWMS 10571-2

Product SKU: 10571
Duct Work Installation SWMS 10571-2 Video

Other Details

PDF Download:
Duct Work Installation SWMS 10571-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Duct Work Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls associated with installing duct work for exhaust and air conditioning systems.

Job Steps Covered in Duct Work Installation SWMS:

(includes potential hazards and control measures)

  1. Planning and Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Work Area Set Up
  5. Materials Delivery
  6. Outdoor/Indoor Units
  7. Installing Ductwork
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...