Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Electrical Fitout (Temporary Connections) SWMS 10567-2

Electrical Fitout (Temporary Connections) SWMS 10567-2

Product SKU: 10567
Electrical Fitout (Temporary Connections) SWMS 10567-2 Video

Other Details

PDF Download:
Electrical Fitout Temporary Connections swms_10567-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Electrical Fitout (Temporary Connections) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls associated with the electrical fitout for live entertainment and events. This SWMS covers working with electricity, portable generators, working at elevated positions and manual handling hazards associated with the task.

Job Steps Covered in Electrical Fitout (Temporary Connections) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Working on or near Energised Electrical Installation or Services
  6. Use of generators
  7. Electrical equipment (lighting etc)
  8. New electrical equipment - testing
  9. Running leads / setting up equipment
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...