Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Electrical (Low Voltage Repairs - Maintenance) SWMS 10091-7

Electrical (Low Voltage Repairs - Maintenance) SWMS 10091-7

Product SKU: 10091
Electrical (Low Voltage Repairs - Maintenance) SWMS 10091-7 Video

Other Details

PDF Download:
electrical_low_voltage_repairs-maintenance_swms_10091-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template 

Electrical Low Voltage - Repairs - Maintenance Safe Work Method Statement

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls associated with general low voltage electrical repairs and maintenance. This SWMS also covers hazards associated with replacing and repairing appliances/equipment.

Low voltage is defined as the range between 50 VAC and 1000 VAC or 120 V ripple-free DC and 1500 VDC

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Electrical Low Voltage - Repairs - Maintenance SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Travel to, from & between sites
    • Assess onsite conditions
    • Working on or near energised electrical installation or services
    • General repairs e.g. repair and fault finding
    • Working in ceiling spaces or subfloor space
    • Re-energise equipment and apparatus and return to service
    • Working with Asbestos
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.


We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...