Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Electrical (New Installation) SWMS 10090-4

Electrical (New Installation) SWMS 10090-4

Product SKU: 10090
Electrical (New Installation) SWMS 10090-4 Video

Other Details

PDF Download:
electrical_new_installation_swms_10090-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Electrical - New Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls associated with new electrical installations

Job Steps Covered in Electrical - New Installation SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Excavating & Backfilling - working with machinery
  6. Electrical Lead in - Underground power
  7. Electrical Lead in - Overhead
  8. Working on or near Energised Electrical Installation or Services
  9. Mount and pre-wire switchboard
  10. Electrical rough in
  11. Fitting appliances / fixtures
  12. Commission appliances
  13. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...