Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Equipment (Assembly and Installation) SWMS 10614-1

Equipment (Assembly and Installation) SWMS 10614-1

Product SKU: 10614
Equipment (Assembly and Installation) SWMS 10614-1 Video

Other Details

PDF Download:
equipment_assembly_and_installation_swms_10614-1_sample.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Equipment (Assembly and Installation) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the general safety steps, hazards and controls associated with the assembly/disassembly of mechanical equipment. Covered in this SWMS is planning and preparation, manual handling, hand/power tools use, working on ladders and general hazards associated with the installation

Job Steps Covered in Equipment (Assembly and Installation) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Equipment delivery & site set-up
  5. Disassembly/assembly/ installation
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...