Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Excavation and Working in Trenches SWMS 10281-4

Excavation and Working in Trenches SWMS 10281-4

Product SKU: 10281
Excavation and Working in Trenches SWMS 10281-4 Video

Other Details

PDF Download:
excavation_and_working_in_trenches_swms_10281-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Includes a site specific Emergency Response Plan
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Trench - Excavations Working In Safe Work Method Statement

This SWMS provides guidance on safe work procedures when working in excavations greater than 1.5m deep. This includes working adjacent to mobile plant, shoring and trench shields, hazardous atmospheres and contaminated ground, contact with overhead electrical services falls and general safety items such as PPE and hazardous manual handling procedures. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Trench - Excavations Working In SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Working at depths greater than 1.5 Metres, including tunnels or mines
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Implement a site specific Emergency Response Plan
    3. Training and Capabilities
    4. Assess onsite conditions
    5. Set up work area
    6. Temporary Traffic Control (TMP)
    7. Delivery of materials/equipment (Pipes, backfill material, steel etc)
    8. Excavating & backfilling - Working adjacent to machinery
    9. Installing & removing trench shields / shoring or other materials
    10. Excavating Trench - Water charged ground
    11. Buried contaminants
    12. Working in trenches > 1.5m deep
    13. Lifting material into excavation e.g. pipes, culverts etc
    14. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 
  • Emergency Response Plan

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...