Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Excavation and Working in Trenches SWMS 10281-5

Excavation and Working in Trenches SWMS 10281-5

Product SKU: 10281
Excavation and Working in Trenches SWMS 10281-5 Video

Other Details

PDF Download:
Excavation and working in trenches SWMS 10281-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Excavation and Working in Trenches Safe Work Method Statement Scope:

This SWMS provides guidance on on working in excavations greater than 1.5m deep. This includes working adjacent to mobile plant, shoring and trench shields, hazardous atmospheres and contaminated ground, contact with overhead electrical services falls and general safety items such as PPE.  

Job Steps Covered in Excavation and Working in Trenches SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival At Site
  4. Set up work area
  5. Delivery of materials/equipment (Pipes, backfill material, steel etc)
  6. Excavating & backfilling - Working adjacent to machinery
  7. Installing & removing trench shields/shoring or other materials
  8. Excavating Trench - Water charged ground
  9. Working in trenches > 1.5m deep
  10. Lifting material into excavation e.g. pipes, culverts etc
  11. On Completion

Click here to view a sample of the Excavation and Working in Trenches SWMS

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...