Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Fencing (Pool) SWMS 10383-5

Fencing (Pool) SWMS 10383-5

Product SKU: 10383
Fencing (Pool) SWMS 10383-5 Video

Other Details

PDF Download:
Fencing (pool) SWMS 10383-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fencing (Pool) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) deals with general hazards associated with the installation of glass or aluminium panel pool fencing. Covered in this SWMS is the delivery of materials, glass handling, installation of posts, attach panels, construct and hang gates, and exposure to Respirable Crystalline Silica (RCS) dust.

Job Steps Covered in Fencing (Pool) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting & loading materials
  4. Arrival at site
  5. General work area set up
  6. Delivery of materials and mobile plant
  7. Mark out the fence
  8. Digging post holes
  9. Setting the posts
  10. Attaching panels & gates
  11. On Completion
  12. Record Keeping/ Health Monitoring

Click here to view a sample of the Fencing (Pool) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...