Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Fire Alarm System Installation SWMS 10641-1

Fire Alarm System Installation SWMS 10641-1

Product SKU: 10641
Fire Alarm System Installation SWMS 10641-1 Video

Other Details

PDF Download:
Fire Alarm System Installation SWMS 10641-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fire Alarm System Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with fire alarm system installation. Included in this SWMS is working with electricity, using ladders and manual handling hazards associated with the task. 

Job Steps Covered in Fire Alarm System Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Working in ceiling spaces
  6. Working on or near energised electrical installation or services
  7. Running cables and installing alarms
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...