Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fire Extinguisher (Installation - Maintenance) SWMS 10423-2

Fire Extinguisher (Installation - Maintenance) SWMS 10423-2

Product SKU: 10423
Fire Extinguisher (Installation - Maintenance) SWMS 10423-2 Video

Other Details

PDF Download:
Fire Extinguisher (installation-maintenance) SWMS 10423-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fire Extinguisher (Installation - Maintenance) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the safe installation and maintenance of fire extinguishers. Included in this SWMS is pre-planning and preparation, preparing the work area, manual handling considerations and electrical safety

Job Steps Covered in Fire Extinguisher (Installation - Maintenance) SWMS: 

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transport and delivery to/between sites
  4. Assess onsite conditions
  5. Fire extinguisher installation /maintenance
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...