Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Flat Pack (Delivery and Assembly) SWMS 10594-2

Flat Pack (Delivery and Assembly) SWMS 10594-2

Product SKU: 10594
Flat Pack (Delivery and Assembly) SWMS 10594-2 Video

Other Details

PDF Download:
flat_pack_delivery_and_assembly_swms_10594-2__19051_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Flat Pack (Delivery and Assembly) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the delivery and assembly of flat pack furnishings. Covered in this SWMS is planning and preparation, vehicle transport & warehouse safety, manual handling, power tools use and general hazards associated with the assembly. 

Job Steps Covered in Flat Pack (Delivery and Assembly) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Loading / Unloading Flat Pack & Equipment
  4. Travel To, From & Between Sites
  5. Assess Onsite Conditions
  6. Building Flat Pack Furnishings
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...