Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Flood & Storm Clean Up SWMS 10

Flood & Storm Clean Up SWMS 10

Product SKU: 10107
Flood & Storm Clean Up SWMS 10 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Flood & Storm Clean Up Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with flood clean up activities. Covering clean up of premises after floods, including removal of contaminated items and building materials. This SWMS briefly discusses risk controls in relation to asbestos and the use of ladders. 

Biological hazards for humans, animals and the environment include: Contaminated waste, contaminated water and mud, dead animals etc. as floodwaters recede. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Flood & Storm Clean Up SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Removal of furniture, household items including fitted cabinets, mud & floor covering (vinyl, linoleum, carpet)
    • Insulation removal
    • Clean and disinfect every surface
    • Waste management 
    • On completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Very Happy

    Posted by on

    We recently had major flooding and this SWMS was invaluable thanks to Safety Culture for getting it out to us when we needed it.


  2. Amazing

    Posted by on

    I run a restaurant and have recently had a lot of problems with flooding. This SWMS lets us safely clean up and get back on our feet as soon as possible. It's a hard life but that's what you have to live with if you want to be the best Sushi chef in Atlantis. Also this website is amazing! Thanks for a job well done to the awesome guy who works on it!


$0.00

PLUS GST

View Cart


You May Also Need...