Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Floors - Timber - Sanding - Finishing SWMS 10

Floors - Timber - Sanding - Finishing SWMS 10

Product SKU: 10108
Floors - Timber - Sanding - Finishing SWMS 10 Video

Other Details

PDF Download:
Floors_Timber_Sanding_Finishing_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Floors - Timber - Sanding - Finishing Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated the use of a floor sander on indoor timber floor and polishing using varnish or similar floor coating.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Floors - Timber - Sanding - Finishing SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Sanding
    • Applying finishing compound
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Worth it

    Posted by on

    Had to do a SWMS for a very large job I was quoting on.
    The download was filled out for me except of course for the obvious. I even deleted the standard logo and inserted my own header. Very professionally completed.
    Saved me a heap of time and for the cost of the download,
    was well worth it.


$79.95

PLUS GST

View Cart


You May Also Need...