Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Floors (Timber - Sanding - Finishing) SWMS 10108-5

Floors (Timber - Sanding - Finishing) SWMS 10108-5

Product SKU: 10108
Floors (Timber - Sanding - Finishing) SWMS 10108-5 Video

Other Details

PDF Download:
floors_timber_-_sanding_-_finishing_swms_10__65474_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Floors - Timber - Sanding - Finishing Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated the use of a floor sander on indoor timber floor and polishing using varnish or similar floor coating.

Job Steps Covered in Floors - Timber - Sanding - Finishing SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Sanding
  6. Applying finishing compound
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Worth it

    Posted by on

    Had to do a SWMS for a very large job I was quoting on.
    The download was filled out for me except of course for the obvious. I even deleted the standard logo and inserted my own header. Very professionally completed.
    Saved me a heap of time and for the cost of the download,
    was well worth it.


$79.95

PLUS GST

View Cart


You May Also Need...