Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Framing (Timber - Steel) SWMS 10270-5

Framing (Timber - Steel) SWMS 10270-5

Product SKU: 10270
Framing (Timber - Steel) SWMS 10270-5 Video

Other Details

PDF Download:
Framing (timber - steel) SWMS 10270-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Framing (timber - steel) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general safety aspects concerning the erection of pre-assembled timber/steel framing and trusses on a prepared foundation for either a single or multi-level structure.

Job Steps Covered in Abrasive Blasting and Coating SWMS:

(includes potential hazards and control measures)

  1. Arrival at site
  2. Materials delivery
  3. Work area set up
  4. Standing wall frames
  5. Fixing ceiling and upper level floor joists
  6. Guarding voids and atriums
  7. Laying upper floor sheeting
  8. Install trusses
  9. On Completion
  10. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...