Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Framing (Timber Steel) - Trusses SWMS 10

Framing (Timber Steel) - Trusses SWMS 10

Product SKU: 10270
Framing (Timber Steel) - Trusses SWMS 10 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Framing (Timber Steel) - Trusses Safe Work Method Statement

This Safe Work Method Statement (SWMS) covers general safety aspects concerning the erection of pre-assembled timber/steel framing and trusses on a prepared foundation for either a single or multi level dwelling.

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Framing (Timber Steel) - Trusses SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Structure or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Hot work permit
    • Training and capabilities 
    • Assess onsite conditions
    • Materials delivery
    • Work area setup
    • Standing wall frames
    • Fixing ceiling and upper level floor joists
    • Guarding voids and atriums
    • Laying upper floor sheeting
    • Install trusses
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...