Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Garden Maintenance SWMS 10232-3

Garden Maintenance SWMS 10232-3

Product SKU: 10232
Garden Maintenance SWMS 10232-3 Video

Other Details

PDF Download:
garden_maintenance_swms_10__52989_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Grounds - Garden Maintenance Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with general grounds maintenance on roadsides and on sites i.e. parks etc. where the general public may be present during the work processes.

This SWMS covers

- Brush Cutter / whipper-snipper - Fuelling onsite
- Hand Tools - Hedge Trimmer
- Leaf blower - Lawn Mower
- Lawn Edger  

Job Steps Covered in Grounds - Garden Maintenance SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between sites
  4. Assess onsite conditions
  5. Prepare intended work site
  6. Gardening & working with hand tools i.e. rakes, shovels etc
  7. Conduct visual pre-inspection of equipment
  8. Operating fuel-powered / electric gardening tools
  9. Spills, litter and sharps management
  10. Refuelling on site
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Easy to use

    Posted by on

    This has been such a time saver for me, so easy to understand!


$79.95

PLUS GST

View Cart


You May Also Need...