Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Glass Awning Installation (Using Scissor Lift) SWMS 10439-1

Glass Awning Installation (Using Scissor Lift) SWMS 10439-1

Product SKU: 10439
Glass Awning Installation (Using Scissor Lift) SWMS 10439-1 Video

Other Details

PDF Download:
Glass Awning Installation (using scissor lift) SWMS 10439-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass Awning Installation (Using Scissor Lift) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of an Elevating Work Platform (EWP) and a mobile Crane to install glass awnings. Included in this SWMS is the planning and preparation, training, prestart and operational controls associated with the task. This SWMS also includes a ‘Falls Emergency Rescue Plan’

Job Steps Covered in Glass Awning Installation (Using Scissor Lift) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Implement a Falls Emergency Rescue Plan
  4. Arrival Onsite
  5. Delivery and Removal of EWP
  6. Working Near Utilities
  7. Work Area Set Up
  8. EWP - Pre-start Check
  9. Pre-framing
  10. Installation of Glass Awning
  11. Framing & Sealing
  12. On Completion
  13. Refuelling on site


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...