Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Glass Lift Shaft Installation (Using Scissor Lift/Scaffolding) SWMS 10481-1

Glass Lift Shaft Installation (Using Scissor Lift/Scaffolding) SWMS 10481-1

Product SKU: 10481
Glass Lift Shaft Installation (Using Scissor Lift/Scaffolding) SWMS 10481-1 Video

Other Details

PDF Download:
Glass Lift Shaft Installation (using scissor lift_scaffolding) SWMS 10481-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass Lift Shaft Installation (Using Scissor Lift/Scaffolding) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with Glass Lift Shaft Installation. Included is working at heights from EWP and Scaffold, working with power tools, manual handling and electrical hazards.

Job Steps Covered in Glass Lift Shaft Installation (Using Scissor Lift/Scaffolding) SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival at Site
  3. Work Area Set-Up
  4. Positioning, Drilling & Tapping of Hole Centres
  5. Install Fittings
  6. Glass Installation
  7. On Completion
  8. Refuelling on Site

 

godigital-digitaljsa-bannerforswmspages-v3.png 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...