Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Glass Movement Onsite SWMS 10625-1

Glass Movement Onsite SWMS 10625-1

Product SKU: 10625
Glass Movement Onsite SWMS 10625-1 Video

Other Details

PDF Download:
Glass Movement Onsite SWMS 10625-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass Movement Onsite Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the handling of glass panels, including the transport of glass sheets to and from the installation point by glass trolley, and storage on site.

Job Steps Covered in Glass Movement Onsite SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Glass panel storage / waste removal area
  5. Manual transport glass panels to and from installation point
  6. Emergency response
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...