Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Glass (Shower Screens - Mirrors) Installation SWMS 10243-6

Glass (Shower Screens - Mirrors) Installation SWMS 10243-6

Product SKU: 10243
Glass (Shower Screens - Mirrors) Installation SWMS 10243-6 Video

Other Details

PDF Download:
Glass (shower screens - mirrors) Installation SWMS 10243-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass (Shower Screens - Mirrors) Installation Safe Work Method Statement Scope:

This SWMS covers general safety issues associated with installation of shower screens and large mirrors. This includes the transport of glass screens to/from sites and general safe handling while on site and during installation. 

This SWMS includes installation works on construction sites (new homes) and existing premises, both domestic and commercial.   

Job Steps Covered in Glass (Shower Screens - Mirrors) Installation SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting screens/ mirrors to/from sites
  4. Arrival onsite & site assessment
  5. Unloading glass screens and mirrors
  6. Work area set up
  7. Installing screens and mirrors
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...