Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Hazardous Substances (Chemicals) SWMS 10392-4

Hazardous Substances (Chemicals) SWMS 10392-4

Product SKU: 10392
Hazardous Substances (Chemicals) SWMS 10392-4 Video

Other Details

PDF Download:
Hazardous Substances (chemicals) SWMS 10392-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Hazardous Substances (Chemicals) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with how to identify and manage health and safety risks when working near or with hazardous chemicals/substances at a workplace. This SWMS does not cover the transportation of chemicals classified as Dangerous Goods, which is covered by the Australian Code for the Transport of Dangerous Goods by Road and Rail (ADG Code).

Hazardous Chemicals/Substances Dangerous Goods Register included.

Job Steps Covered in Hazardous Substances (Chemicals) SWMS: 

(includes potential hazards and control measures)

  1. Employer / Person Conducting the Business or Undertaking (PCBU) responsibilities
  2. Purchasing Chemicals / Substances
  3. Training and Capabilities
  4. Chemical storage & transporting
  5. Construction work area set up
  6. Labelling
  7. Use & handling chemicals
  8. Confined spaces
  9. Maintaining hazardous chemical controls
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...