Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Heat Stress SWMS 10

Heat Stress SWMS 10

Product SKU: 10129
Heat Stress SWMS 10 Video

Other Details

PDF Download:
Heat Stress SWMS 10129-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Heat Stress Safe Work Method Statement

This SWMS covers working in excessively hot environments (such as on roofs, foundries, etc.). The effect of heat and high humidity on the body is not based on air temperature alone; radiant heat, high humidity, hot objects, or strenuous physical activity may also impact the health of an individual. Thermal comfort is subjective, but generally, conditions above 26 degrees C and, relative humidity higher than 60 per cent may cause heat stress which may require controls to be initiated.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Heat Stress SWMS Content: 

  • High Risk Construction Work
    • Artificial extremes of temperature  
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Acclimatise workers
    • Conduct Risk Assessment
    • Working in hot environments
    • Emergency response
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


Showing reviews 1-10 of 11 | Next

  1. Great starting point

    Posted by on

    Thank you for this Heat Stress SWMS.
    It is a very useful starting point for workers to customize to suit the current conditions.
    Lots of detail.


  2. SWMS Heat Stress

    Posted by on

    This free SWMS was of excellent quality, easy to understand and apply in the field, great for any business who personnel are exposed to the elements of an Australian summer.


  3. Spruce Clean Pty Ltd

    Posted by on

    Dealing with Australia's ever changing weather, Heat Stress SWMS is a must have SWMS to all businesses operating outdoors, as well as in conditions where heat is a factor.


  4. Heatwave SWMS

    Posted by on

    The SMWS gives good information for those looking for more details into Heat management and ways to work around heat scenarios. So easy to work with and make changes to it as you need to keep up the good work.


    --------------------------------------------------------------------------------


  5. Heat Stress SWMS

    Posted by on

    This free product was a good one for our clients as it is something that they can develop into their own document without it appearing that we are pushing our company OHS onto them thus allowing them to manage their employees better when hot weather strikes.


  6. Not Bad

    Posted by on

    I found it had relevant information but still needed some tweaking, but overall found it reasonably good. Some good nformation and clearly well thought through.


  7. Heatwave SWMS

    Posted by on

    This SMWS gives good information and references for those looking for more details into Heat management and ways to work around heat scenarios


  8. Heat Stress SWMS

    Posted by on

    The Safety Culture template provided a sound basis on which to develop OFSC compliant SWMS with not too much tweaking to bring it up to standard.


  9. heatwave

    Posted by on

    Very informative and helpful in an area that directly affects my business, a small fabrication workshop that regulary sees temperatures above 35 degrees in summer.


  10. Thanks...

    Posted by on

    What a great Idea to offer the SWMS - Heat Stress as a give away, especially as our days are getting hotter, and a SWMS that some of us would have overlooked; but very necessary. Kerp up the great work guys...


Showing reviews 1-10 of 11 | Next

$79.95

PLUS GST

View Cart


You May Also Need...