Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Heavy Vehicles -Service Maintenance SWMS 10

Heavy Vehicles -Service Maintenance SWMS 10

Product SKU: 10085
Heavy Vehicles -Service Maintenance SWMS 10 Video

Other Details

PDF Download:
MobilePlant_heavy_vehicle_service-maintenance_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Heavy Vehicles - Service Maintenance Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with aspects of earth moving machinery and equipment maintenance undertaken at other sites –such as a construction site or farm. Earthmoving equipment: any mobile plant / equipment used for undertaking earthmoving activities. (I.e. front-end loaders, excavators, backhoes, dozers, graders, skid-steer loaders and tractors etc.)

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Heavy Vehicles - Service Maintenance SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Travel to / from site
    • Assess onsite conditions
    • Designate a suitable area for maintenance
    • Servicing plant on site
    • Pneumatic / powered grease guns
    • Air Tools
    • Refuelling
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...