Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Hebel Construction SWMS 10564-2

Hebel Construction SWMS 10564-2

Product SKU: 10564
Hebel Construction SWMS 10564-2 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor SafetyCulture to use this template

Insulation Safe Work Method Statement

This SWMS covers general hazards relating to work with Hebel products such as blocks and panels. Included in this SWMS is planning and preparation, manual handling considerations, cutting Hebel products and use of adhesives.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Insulation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Materials delivery & placement
    • Work area set up
    • Mixing & applying mortar / adhesives, patch etc
    • Laying / Handling blocks
    • Standing wall panels (Manual lift only)
    • Cutting / trimming Hebel
    • Using Caulking products / guns
    • Working at elevated positions
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...