Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Height (Building Maintenance Unit) BMU SWMS 10289-2

Height (Building Maintenance Unit) BMU SWMS 10289-2

Product SKU: 10289
Height (Building Maintenance Unit) BMU SWMS 10289-2 Video

Other Details

PDF Download:
Height (building maintenance unit) BMU SWMS 10289-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Height (Building Maintenance Unit) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the use of a BMU while cleaning windows and general building maintenance such as painting, window/glass replacement, cleaning etc.

Included in this SWMS is a Daily Swing Stage Checklist and a Falls Emergency Rescue Plan.

Job Steps Covered in Height (Building Maintenance Unit) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Implement a Falls Emergency Rescue Plan
  4. Assess onsite conditions
  5. Working area set up
  6. Pre-Operational Inspection
  7. Working on suspended BMU
  8. Working on ground
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...