Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Height (Man Cage) SWMS 10137-3

Height (Man Cage) SWMS 10137-3

Product SKU: 10137
Height (Man Cage) SWMS 10137-3 Video

Other Details

PDF Download:
height_man_cage_swms_10__23891_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Man Cage Safe Work Method Statement Scope:

This SWMS provides guidance on safe operation when working at height in a Work Box. Work Boxes may also be called Man Baskets or Man Cages.

This SWMS does not cover the operation of specific items of plant used to perform lifts such as cranes or fork trucks etc. This SWMS should be used in conjunction with dedicated SWMS that have been developed for these items of plant.

Job Steps Covered in Man Cage SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Implement a Falls Emergency Rescue Plan (Included in SWMS)
  4. Assess Onsite Conditions
  5. Work Area Set Up
  6. Work Box - Pre-start check
  7. Pre-start check - Lifting Plant
  8. Trial Lift 
  9. Work Box Operation
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...