Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Height (Mobile Scaffold) SWMS 10386-5

Height (Mobile Scaffold) SWMS 10386-5

Product SKU: 10386
Height (Mobile Scaffold) SWMS 10386-5 Video

Other Details

PDF Download:
height_mobile_scaffold_swms10__88937_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Height (Mobile Scaffold) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the erection, dismantling and use of mobile scaffold. 

This SWMS does not cover the specific setup of height access equipment. Unless otherwise mentioned in this SWMS a separate, dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile Elevated Work Platforms etc.

Job Steps Covered in Height (Mobile Scaffold) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Loading / unloading mobile scaffold
  5. Work area set up
  6. Erecting scaffold
  7. Moving and accessing mobile scaffold
  8. Working on scaffold
  9. Working on ground
  10. Dismantling scaffold
  11. Remote and/or isolated work
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...