Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with installation, use and subsequent dismantling of roof edge protection systems. This SWMS also includes a Falls Emergency Rescue Plan Tool.
This SWMS does not cover the specific setup of height access equipment. A dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Elevated Work Platforms etc.
(includes potential hazards and control measures)