Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Height (Rope Access) SWMS 10142-7

Height (Rope Access) SWMS 10142-7

Product SKU: 10142
Height (Rope Access) SWMS 10142-7 Video

Other Details

PDF Download:
height_rope_access_swms_10__28625_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Height (Rope Access) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of industrial rope access systems. 

This SWMS does not cover the specific  setup of height access equipment. A dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Mobile Elevated Work Platforms etc. 

Job Steps Covered in Height (Rope Access) SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & set-up onsite
  4. Work area set up
  5. Test anchor points
  6. Pre operational inspection
  7. Rope Access Operation
  8. Dismantling Rope Access system
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...