Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Height (Working On) Swing Stage SWMS 10537-2

Height (Working On) Swing Stage SWMS 10537-2

Product SKU: 10537
Height (Working On) Swing Stage SWMS 10537-2 Video

Other Details

PDF Download:
Height Working on Swing Stage SWMS_10537-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Height (Working On) Swing Stage Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with with the use of suspended scaffold systems. Falls Emergency Rescue Plan and Daily Swing Stage Checklist included.

Job Steps Covered in Height (Working On) Swing Stage SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at Site
  4. Work Area Setup
  5. Per Operational Inspection
  6. Working on Suspended Scaffold
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...