Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Heights (Working at) SWMS 10131-6

Heights (Working at) SWMS 10131-6

Product SKU: 10131
Heights (Working at) SWMS 10131-6 Video

Other Details

PDF Download:
Heights (working at) SWMS 10131-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Working at Heights Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers the risk management processes and procedures that need to be followed when preparing to work at height. Covered in this document is planning and preparation, pre-start inspections, operational considerations and emergency management procedures. Working at Heights Risk Assessment Checklist included.

Due to the high-risk nature of working at height, height equipment specific SWMS will need to be implemented for these tasks prior to commencing the activity or this SWMS modified to suit.

Job Steps Covered in Working at Heights SWMS: 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Conduct Risk Assessment
  5. Working at height
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Good stuff

    Posted by on

    I found the product easy to understand and modify as have been all of the products I have purchased from you. The instructions are straightforward, progressive and made easy to follow and action by all parties who use it. thank You for a good product.


  2. Quick n easy

    Posted by on

    This product made my company look professional and organised without spending hours and hours preparing or paying someone to have documents specifically drawn up when all I did was made changes to suit specific tasks.

    Very impressed and will always use these products!


$79.95

PLUS GST

View Cart


You May Also Need...