Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

High Pressure Water Jet Cleaner SWMS 10189-8

High Pressure Water Jet Cleaner SWMS 10189-8

Product SKU: 10189
High Pressure Water Jet Cleaner SWMS 10189-8 Video

Other Details

PDF Download:
high_pressure_water_jet_cleaner_swms_10189-8_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

High Pressure Water Jet Cleaner Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the operation of a petrol or electric powered high pressure Water Jet Cleaners that utilise cold water, hot water and steam. Included in this SWMS is preparation and planning, training, prestart and operational use, hazardous materials and refueling.

Job Steps Covered in High Pressure Water Jet Cleaner SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Work area set up
  5. Pre-start check
  6. Operating the water jet cleaner
  7. Working with hazardous materials
  8. Refuelling on site
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...