Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Hoist Operation (Personnel and Materials) SWMS 10618-1

Hoist Operation (Personnel and Materials) SWMS 10618-1

Product SKU: 10618
Hoist Operation (Personnel and Materials) SWMS 10618-1 Video

Other Details

PDF Download:
hoist_operation_personnel_-_materials_swms_10618-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Hoist Operation (Personnel and Materials) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the operation of personnel and material hoists. Included in this SWMS is preparation and planning, training, pre-start and operational use of the hoist.

Job Steps Covered in Hoist Operation (Personnel and Materials) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Conduct a Pre-operational Inspection
  4. Operating Hoist
  5. Working on Ground
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...