Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Hot Works (Welding) SWMS 10136-6

Hot Works (Welding) SWMS 10136-6

Product SKU: 10136
Hot Works (Welding) SWMS 10136-6 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Suitable for stick, spot, MIG, TIG, Oxy-Acetylene & Gas Metal Arc Welding 
  • Complies with current legislation in all States and Territories
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Welding (Hot Works) Safe Work Method Statement

Suitable for the following welding types: stick, spot, MIG, TIG, Oxy-Acetylene, Gas Metal Arc Welding. This Safe Work Method Statement (SWMS) document covers the safety steps, general hazards and controls associated with welding work tasks being undertaken either indoors or outdoors. "Hot works" means riveting, welding, flame cutting or other fire or spark-producing operation. 

This SWMS does not cover Hot Works being undertaken in Confined Spaces or on bulk tanks/vessels/drums that contain/ed flammable materials or other hazardous chemicals.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Welding (Hot Works) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Attain Hot Work Permit from responsible person
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Welding
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...