Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Kitchen (Commercial) Appliance Repairs SWMS 10318-3

Kitchen (Commercial) Appliance Repairs SWMS 10318-3

Product SKU: 10318
Kitchen (Commercial) Appliance Repairs SWMS 10318-3 Video

Other Details

PDF Download:
Kitchen (Commercial) Appliance Repairs SWMS 10318-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Kitchen (Commercial) Appliance Repairs Safe Work Method Statement:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with repair, service and maintenance of commercial grade kitchen/catering equipment (such as ovens/dishwashers etc.).

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Kitchen (Commercial) Appliance Repairs SWMS Content: 

  • High Risk Construction Work
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines and energised electrical installations or services   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess Site
    • Setup Work Area
    • Undertake Maintenance
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee Sign off Section
  • Review & Monitoring 

 

swmsformats.png 

 

app-store-badge.png       google-play-badge.png

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...