Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Kitchen Exhaust Installation SWMS 10543-1

Kitchen Exhaust Installation SWMS 10543-1

Product SKU: 10543
Kitchen Exhaust Installation SWMS 10543-1 Video

Other Details

PDF Download:
Kitchen Exhaust Installation SWMS 10543-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Kitchen Exhaust Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated the installation of an exhaust canopy/hood into a commercial kitchen.

Job Steps Covered in Kitchen Exhaust Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Work Area Set Up
  5. Installing the Canopy/Hood
  6. Using Power Tools
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...