Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Landscaping (Irrigation) SWMS 10403-3

Landscaping (Irrigation) SWMS 10403-3

Product SKU: 10403
Landscaping (Irrigation) SWMS 10403-3 Video

Other Details

PDF Download:
Landscaping (Irrigation) SWMS 10403-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Landscaping - Irrigation System Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the safe installation of irrigation systems into commercial and domestic landscape areas on public and private property.

Job Steps Covered in Landscaping - Irrigation System Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Unloading / storage of materials
  5. Work area set up
  6. Setting out
  7. Excavation - sub surface installation
  8. Install the valve manifold
  9. Running pipework & connecting risers and sprinkler heads
  10. Install the controller
  11. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...