Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Landscaping (Water Feature) SWMS 10562-1

Landscaping (Water Feature) SWMS 10562-1

Product SKU: 10562
Landscaping (Water Feature) SWMS 10562-1 Video

Other Details

PDF Download:
Landscaping Water Feature SWMS 10562-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Landscaping - Water Feature Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides a generic outline of the safety steps, general hazards and controls associated with the installation of water features and garden ponds. Covered in this SWMS is planning and preparation of the work, delivery of materials, excavation, liners and hard shells, placement of edge capping and installation of low voltage pumps and lights.

Job Steps Covered in Landscaping - Water Feature SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Loading and transporting materials e.g. pond shells
  4. Assess onsite conditions
  5. General work area set up
  6. Delivery of materials and mobile plant
  7. Mark out water feature/pond
  8. Excavation & backfill
  9. Placing pond shell
  10. Placement of plastic liner
  11. Placing header / capping material (e.g. pavers, rock etc)
  12. Galvanised steel mesh - pond safety cover
  13. Low voltage lighting / pumps
  14. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...