Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Lead Paint Removal SWMS 10615-2

Lead Paint Removal SWMS 10615-2

Product SKU: 10615
Lead Paint Removal SWMS 10615-2 Video

Other Details

PDF Download:
Lead Paint Removal SWMS 10615-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Lead Paint Removal Safety Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls when preparing a surface for repainting that has existing lead paint applied. Covered in this SWMS is lead removal, working with chemicals, manual handling and environmental waste.

Job Steps Covered in Lead Paint Removal Safety SWMS:

(includes potential hazards and control measures)

  1. Health Monitoring
  2. Arrival at Site
  3. Conduct a Risk Assessment
  4. Work Area Setup
  5. Lead Paint Removal 
  6. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...