Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Lift Frame Maintenance SWMS 10644-1

Lift Frame Maintenance SWMS 10644-1

Product SKU: 10644
Lift Frame Maintenance SWMS 10644-1 Video

Other Details

PDF Download:
lift frame maintenance_swms_10644-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Lift Frame Maintenance Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the safe installation of stainless steel overlays on elevator entrance frames. Included in this SWMS is planning and preparation, training and competency requirements, working with the public and operational safety requirements associated with the task.

Job Steps Covered in Lift Frame Maintenance SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Site Set-up
  4. Installing Overlays
  5. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...