Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Lock Out Tag Out (LOTO) SWMS 10

Lock Out Tag Out (LOTO) SWMS 10

Product SKU: 10166
Lock Out Tag Out (LOTO) SWMS 10 Video

Other Details

PDF Download:
LockOut_TagOut_LOTO_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • SWMS includes a Isolation Permit To Work & Lockout / Tagout Procedures
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Lock Out Tag Out (LOTO) Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls involved with the Lock Out/Tag Out (LOTO) of plant and equipment.This document applies to all items of plant and equipment that is acquired (purchased/hired/leased/ loaned/donated), installed, used, and operated, stored or maintained on site.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Lock Out Tag Out (LOTO) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Confined space entry
    • Pre-start
    • Lock Out / Tag Out
    • Restoring equipment to service
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...