Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Lock Out Tag Out (LOTO) SWMS 10166-5

Lock Out Tag Out (LOTO) SWMS 10166-5

Product SKU: 10166
Lock Out Tag Out (LOTO) SWMS 10166-5 Video

Other Details

PDF Download:
Lock Out Tag Out (LOTO) SWMS 10166-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Lock Out Tag Out (LOTO) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls involved with the Lock Out/Tag Out (LOTO) of plant and equipment.This document applies to all items of plant and equipment that is acquired (purchased/hired/leased/ loaned/donated), installed, used, and operated, stored or maintained on site.

This SWMS also includes Isolation Permit To Work and Lockout/Tagout Procedure

Job Steps Covered in Lock Out Tag Out (LOTO) SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Confined Space Entry
  4. Pre-start
  5. Lock Out / Tag Out
  6. Restoring Equipment to Service
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...