Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Make Safe - Damaged Roof SWMS 10

Make Safe - Damaged Roof SWMS 10

Product SKU: 10583
Make Safe - Damaged Roof SWMS 10 Video

Other Details

PDF Download:
MakeSafe_Damaged_Roof_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Make Safe SWMS for first respondents performing 'make safe' tasks after an emergency event
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Make Safe Damaged Roof Safe Work Method Statement

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event. As such, this SWMS may refer to additional high-risk SWMS for further detail. This SWMS provides guidance on making roofs temporarily secure after the roof has been damaged from storm, lightning etc.

The SWMS covers access to single story buildings via an extension ladder. This SWMS does not cover the specific setup of particular height access equipment. Unless otherwise mentioned in this SWMS a separate, dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Mobile Elevated Work Platforms, installing edge protection etc.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Make Safe Damaged Roof SWMS Content: 

  • High Risk Construction Work
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Conduct Risk Assessment
    • Assess onsite conditions
    • Minor roof repair (e.g. replacing a few tiles or sheeting) or placing of a tarp
    • Fall from roof
    • On completion
  • Falls Emergency Rescue Plan
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...