Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Make Safe (Fire Damaged Structure) SWMS 10586-2

Make Safe (Fire Damaged Structure) SWMS 10586-2

Product SKU: 10586
Make Safe (Fire Damaged Structure) SWMS 10586-2 Video

Other Details

PDF Download:
make_safe_fire_damaged_structure_swms_10586-2__25534_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Make Safe Fire Damaged Structure Safe Work Method Statement Scope:

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event. As such, this SWMS may refer to additional high-risk SWMS for further detail. 

This SWMS provides guidance on making fire damaged premises temporarily safe and secure. The SWMS covers the temporary support of walls and roofs, boarding up of windows and doors.

Refer to companion SWMS for securing ceilings, damaged roofs and perimeter temporary fencing.

Job Steps Covered in Make Safe Fire Damaged Structure SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Site Assessment
  4. Perimeter Fencing
  5. Temporary Bracing of Roof, Boarding up Windows & Doors
  6. Asbestos
  7. Secure Ceilings
  8. Make Safe the Roof
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...